|
|
LAKE CITY CONDOMINIUM - PHASE 3
|
 |
Development Reviews
-
4-bedroom units with a spacious built-up of 1,600 sf.
-
3-bedroom units with built-up of 1,313 sf are also available.
-
Impressive grand entrance lift lobby.
-
Facilities include swimming & wading pools, gymnasium,
clubhouse, mini-market, cafeteria, saloon, children's playground & nursery,
house keeping services, covered car park and satellite MATV-ready.
-
Card access, 24-hour security.
-
Tranquil and serene environment, with breathtaking view of
landscaped garden.
Location and Accessibility
-
Easily accessed from KL city centre via Jalan Genting Klang -
Jalan Tun Razak.
-
To Ampang/Petaling Jaya via MRR2.
|
Condominium
Mapping Types
-
Type A/A1 (Built-up Area 1600 Sq.Ft.)
-
Type Ax (Built-up Area 1805
Sq.Ft.)
-
Type B/B1 (Built-up Area 1313
Sq.Ft.)
-
Type Bb/Bb1 (Built-up Area 1313
Sq.Ft.)


Showroom Pictures


|
Specifications
|
Architectural Specifications
Structure
Walls
Wall Finishes
Sim Coat/Plaster & Paint
Windows
Floor Finishes
Entrance Door
Internal Doors
Locks
Ceiling Finishes
Paintworks
|
- Reinforced Concrete Frame
- Masonry Brick / Concrete Walls
- Ceramic tiles - Kitchen 5' height
-
Bathrooms Full Height
- All Other Walls
- Aluminium Framed Window
- Ceramic tiles - Bedrooms, Kitchen, Bathrooms, Living,
Dining, Yard & Balcony.
- Timber Door
- Plywood Flush Door
- Quality Locksets
- Skim Coat and Paint - All Ceiling
Asbestos Free Cement Board - Bathroom only
- Emulsion Paint - Internal Walls
Weather Shield Paint - External Walls
|
Electrical Specifications
Power Points
Fan Points
Ceiling Light Points
A/C Points
Telephone Points
TV Antenna Outlet
Distribution Board
Door Bell Point
Sanitary Specifications
Granatek Vanity Wash Basin&Tap
Aluminium Kitchen Sink & Tap
Shower Head
Water Closet
Bib Tap to Yard
A/C Drain Pipe
|
A/A1
11
1
13
2
2
2
1
1
2
1
2
2
1
2
|
AX
12
1
14
2
2
2
1
1
2
1
2
2
1
2
|
B/B1
12
1
14
2
2
2
1
1
2
1
2
2
1
2
|
Bb/Bb1
11
1
15
2
2
2
1
1
2
1
2
2
1
2
|
|
|
| All the above
specification shall subject to variation and modification as required by the
Vendor’s Architect and/or the appropriate Approving Authorities. |
|
|
|
|
|
|
|
|